Jump to content
Sign in to follow this  
Race Guy

BD-RE Build To Drive Timing

Recommended Posts

If I build an image directly to the drive using a "virgin" BD-RE, the steps on my end are:

 

1) Format disc (which takes about 1h20min)

2) Zeroing sectors (which takes about 40min)

3) The image build/write starts, the "label" box opens & you have 30 seconds to alter the label or it's auto accepted.

4) A confirmation box opens that shows the image "specs" & you can OK or Cancel. It's "frozen" there till you pick.

 

Could you eliminate (or make switchable) the "30 second timeout" on the label box. I usually want to alter the label, but if I'm not there to catch that 30 second window, there's no way to back up to it other than canceling the whole thing out. Since we freeze on the next step, why not freeze on the labeling step?

 

Thanks!

Share this post


Link to post
Share on other sites

I KNEW you might say something like that LUK!

 

I was building/writing an RE when I asked, so I couldn't look at the settings for at LEAST another hour & a half.

 

See ya!

Share this post


Link to post
Share on other sites
Sign in to follow this  

×

Important Information

By using this site, you agree to our Terms of Use.